View Issue Details

IDProjectCategoryView StatusLast Update
0000909K18X001.00 SKB SWANHWpublic2021-12-23 19:31
Reporter(ALTech) SH Son Assigned To(PM) Henry ChiouDue Date
PrioritynormalSeveritys2-severeReproducibilityhave not tried
Status closedResolutionfixed 
Summary0000909: [SWAN] mechanical BOM for Mockup
DescriptionHere is mechanical BOM for Mockup draft version and Assembly structure.

Please review for your reference
 - manufacturing engineer will have to review , and some of sub-assembly is TBD
TagsNo tags attached.
Attach Tags

Relationships

related to 0000885 closed(HW) Sean Chiang [SWAN] EVT HW Data 
related to 0000945 closed(PM) Henry Chiou [SWAN] Mockup assembly guide 

Users monitoring this issue

Activities

(ALTech) SH Son

2020-09-03 08:18

developer   ~0004202

Last edited: 2020-09-03 10:06

Here is mechanical BOM for Mockup draft version and Assembly structure.

Please review for your reference
 - manufacturing engineer will have to review , and some of sub-assembly is TBD

(PM) Henry Chiou

2020-09-03 15:30

developer   ~0004216

Hi SH,

For BOM list, plz help check the owner of items that are categorized as ALT. I already filled out the PCBAs and speakers plz complete the rest. Besides,
1. HEATSPREADER AMP TOP and HEATSPREADER SOC BOTTOM are listed in this BOM list, but there are actually 2 extra headspreader such as HEATSPREADER SOC TOP and HEATSPREADER SOC BOTTOM. Why only 2 parts are listed here? Do you mean the former 2 will be provided by ALT and FXN take care of the latter 2?
2. The speaker will be provided by Dreamus and will be assembled by Inkel with housing then to FXN?
3. All the screws will be provided by Inkel according to JW KIM. Why is "SCREW_PCBA MAIN+ETC+THERMAL ASS'Y" not listed in Inkel's ownership?
4. Some items in the excel need a bit more explanation as remarked.

About assembly SOP...it is not defined as the pdf file provided is the pure exploded view. How the parts are provided is not defined either.

Best,
Henry

(PM) Henry Chiou

2020-09-03 15:30

developer   ~0004217

attached the excel file

(ALTech) SH Son

2020-09-04 11:39

developer   ~0004233

Hi Henry

Here is feedback 0000909:0004216

1. No.
That means that it assemble the heat spreader with housing directly.
Below heat spreader is assemble without housing directly.
HEATSPREADER SOC TOP and HEATSPREADER SOC BOTTOM.
 
2. No
Currently mechanical structure, speakers have to assembled FA station.
 
3. Please see the attachment file.
SCREW_PCBA MAIN+ETC+THERMAL ASS'Y is designed by FXN. The Foxconn has responsible for this structure (Main PCBA + AMP PCBA and Heat spreader).
https://mantis.cnsbg.foxconn.com/vaas/view.php?id=847#c4055
 
4. Please see the attachment file.


About this mockup BOM is just complete list-up, the R&R needs further discussion : FXN with ALT – Inkel, Dreamus
Thanks
SON

(PM) Henry Chiou

2020-09-04 20:02

developer   ~0004245

Hi SH,

Thanks for the reply.
1. If the heatspreaders are on the housing then our ME suggests HEATSPREADER AMP TOP and HEATSPREADER SOC BOTTOM should be developed and provided by Inkel since the housing is designed by them.
2. Then this is different from the biz framework provided. I need to discuss with ME to check what is the best way for the assembly.
The ownership of each material will affect the quotation which Steve has been asking. When will the R&R be fixed? If you need a concall meeting we can also join.

Best,
Henry

(ALTech) SH Son

2020-09-07 10:26

developer   ~0004247

Hi Henry.
reply 0000909:0004245

1. The Foxconn has the role of thermal solution. and thermal solution included heat spreader.
ALT with Inkel was suggest and guide heat spreader layout. Because it has to be assembled with the housing
thereafter, Mr. Daniel was designed as Inkel suggestion.
check design history below
https://mantis.cnsbg.foxconn.com/vaas/view.php?id=847#c4055

Currently on mockup design, HEATSPREADER AMP TOP and HEATSPREADER SOC BOTTOM are be assembled at FXN side.

2. Please suggest the best way you think first.
the basic R&R is below.
: Foxconn will manufacturing SWAN
: InKel will design and housing supply

I think it will take a lot of discussion to organize detailed R&R due to many subsidiary materials on the acoustic side.
Let's talk after making each draft best way to manufacturing.

Thanks
SON

(ALTech) SH Son

2020-11-16 15:38

developer   ~0005009

2D drawing / BOM list - part and sub assembly email history.

(ALTech) SH Son

2020-11-16 15:39

developer   ~0005010

@Henry

Please refer to the part list and sub assembly list.

Thank
SON

(ALTech) SH Son

2020-11-17 20:03

developer   ~0005029

@Henry

Here is updated as your requested 2D drawings.
please find the attachment file

Thanks
SON

(PM) Henry Chiou

2020-12-08 17:35

developer   ~0005354

Hi SH,

The part 4010-21684-300-0V (BRACKET WALL MOUNT) will come with 1500-21114-600-0V (SCREW BRACKET WALL MOUNT) in a PE bag? We need to confirm how they are shipped to us and remark in the system in case IQC reject the parts.

Thanks
Henry

(ALTech) SH Son

2020-12-09 09:26

developer   ~0005363

Hi henry,
this packing spec is not defined yet. if you need any requirement for gift packing, please let me know. I will discuss with Inkel

thanks
SON

(PM) Henry Chiou

2020-12-10 10:46

developer   ~0005400

Hi SH

If not decided yet, plz kindly have Inkel ship out separately for DVT as we are applying for the PN separately as designation letter indicates.

Thanks
Henry

(ALTech) SH Son

2020-12-10 14:10

developer   ~0005407

Hi henty.

I will request this item pack separately for DVT.

Thanks
SON

Issue History

Date Modified Username Field Change
2020-09-03 08:17 (ALTech) SH Son New Issue
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (ALTech) SB Park
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (HW) Sean Chiang
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (HW) Tom Lee
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (ME) Daniel Hu
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (PM) Henry Chiou
2020-09-03 08:18 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2020-09-03 08:18 (ALTech) SH Son File Added: BOM LIST_BFX_UA300_REV0.xlsx
2020-09-03 08:18 (ALTech) SH Son File Added: (2020.0902) Assembly structure_BFX_UA300_rev00.pdf
2020-09-03 08:18 (ALTech) SH Son Note Added: 0004202
2020-09-03 08:18 (ALTech) SH Son Assigned To => (PM) Henry Chiou
2020-09-03 08:18 (ALTech) SH Son Status new => assigned
2020-09-03 08:19 (ALTech) SH Son Relationship added related to 0000885
2020-09-03 10:06 (ALTech) SH Son Note Edited: 0004202
2020-09-03 15:30 (PM) Henry Chiou Note Added: 0004216
2020-09-03 15:30 (PM) Henry Chiou File Added: BOM LIST_BFX_UA300_REV0-2.xlsx
2020-09-03 15:30 (PM) Henry Chiou Note Added: 0004217
2020-09-04 11:39 (ALTech) SH Son File Added: BOM LIST_BFX_UA300_REV0-2_ALT.xlsx
2020-09-04 11:39 (ALTech) SH Son Note Added: 0004233
2020-09-04 20:02 (PM) Henry Chiou Note Added: 0004245
2020-09-07 10:26 (ALTech) SH Son Note Added: 0004247
2020-09-23 11:09 (ALTech) SH Son Relationship added related to 0000945
2020-11-13 11:14 (SW) Jacky Chiang Project T99X171.00 SKB Eagle => K18X001.00 SKB SWAN
2020-11-16 15:38 (ALTech) SH Son File Added: 2020-10-30_Part drawing_RE_ RE_ @1019 ALT_Fii DVT critical items review minutes.msg
2020-11-16 15:38 (ALTech) SH Son File Added: 2020-11-06_SUB assy drawing_RE_ RE_ @1019 ALT_Fii DVT critical items review minutes.msg
2020-11-16 15:38 (ALTech) SH Son File Added: 2020-10-30_BOM_0.45_RE_ RE_ @1019 ALT_Fii DVT critical items review minutes.msg
2020-11-16 15:38 (ALTech) SH Son Note Added: 0005009
2020-11-16 15:39 (ALTech) SH Son File Added: BOM_BFX_UA300_REV04.52_ALT_foxconn.xlsx
2020-11-16 15:39 (ALTech) SH Son Note Added: 0005010
2020-11-17 20:03 (ALTech) SH Son File Added: GASKET_FABRIC_SCREW_HOLDER_7_ITEMS.zip
2020-11-17 20:03 (ALTech) SH Son Note Added: 0005029
2020-11-20 22:06 (PM) Henry Chiou Issue Monitored: (RD) Jim Chen
2020-12-08 17:35 (PM) Henry Chiou Note Added: 0005354
2020-12-09 09:26 (ALTech) SH Son Note Added: 0005363
2020-12-10 10:46 (PM) Henry Chiou Note Added: 0005400
2020-12-10 14:10 (ALTech) SH Son Note Added: 0005407
2021-12-23 19:31 (HW) Sean Chiang Status assigned => closed
2021-12-23 19:31 (HW) Sean Chiang Resolution open => fixed